Chinese

Brief introduction to ACAY HEPP
ACAY HEPP is situated in Aydin Province, Turkey. The installed capacity is 2x11000kW+1x5500kW with the design water head of 87m, design water flow of 14.5m3/s and 7m3/s. It is a vertical Francis unit. The completing electro-mechanical equipment supply contract was signed on May 2008 by Hangzhou Yatai Hydro Equipment Completing Co., Ltd., subsidiary of Hangzhou Regional Center For Small Hydropower(HRC), providing turbine, generator, excitation system, governor, butterfly valve, SCADA system, high and low voltage switch gear, temperature measuring and braking cubicle, automation components, oil, air and water system etc.


ACAY HEPP is the fastest installation project of Hangzhou Yatai Hydro Equipment Completing Co., Ltd. The electro-mechanical equipment on-site installation started in early May 2008. The preliminary acceptance was completed and three units were put into operation on August 19, 2008. Good quality of equipment, efficient installation team, perfect after-sales service of this project impressed the owner and laid a solid foundation for Hangzhou Yatai to develop hydropower projects in Turkey.


Full view of the Powerhouse
Spiral case Lifting
Turbine
Alignment
Generator Floor
Central Control Room

Copyright © HRC Secretariat All rights reserved